The Purpose of this meeting
-
Present the proposed 5’ sidewalk
-
Provide an update on this project
-
Receive comments on the proposed design
Project Description
A new 5’ sidewalk will be constructed on the North side of Ribaut Road (US 21) from Lenora Drive to the existing sidewalk near Rahn Lane. The sidewalk provides access to Lenora Park and the future extension of the Spanish Moss Trail.
This project is one of the priority pathway/sidewalk projects.
Project Status
The project is located on US 21 and will be coordinated with SCDOT. It also requires new R/W and the R/W acquisition process is beginning. Construction of the sidewalk is anticipated Fall/Winter 2021.
In addition to the video shown at the top, these exhibit graphics are included to explain the project.
The exhibit contains the design information for the proposed 5’ sidewalk. On the plan sheets, the new 5’ sidewalk is shown as well as new right-of-way (R/W).
How to Comment
Official Comment Period: March 15, 2021 – April 11, 2021
Your comments are welcomed and encouraged. The following are options for your comment to become part of the project records:
Website Comment
Comment by Mail
Comments submitted through this online form will receive a formal response
and can be made until April 11, 2021
when the comment period will officially close.
Beaufort County Capital Projects
2266 Boundary Street
Beaufort, SC 29902
Attn: Ribaut Rd Sidewalk Project
Email: info@beaufortcountypenny.com